Product Details:
Payment & Shipping Terms:
|
Dimension(l*w*h): | 9500mm*1550mm*1700mm | Use: | C And Z Purlin |
---|---|---|---|
Raw Material: | Galvanized Steel | After-sales Service Provided: | Video Technical Support |
Warranty: | 24 Months | Control System: | Totally Automatic PLC Taiwan Delta |
Highlight: | cz purlin roll forming machine,cold rolled purlin roll forming machine,building materials purlin roll forming machine |
Interchange CZ Cold Rolled Purlin Roll Forming Machine For Building Materials
Interchange CZ Cold Rolled Purlin Roll Forming Machine For Building Materials
Interchange CZ Cold Rolled Purlin Roll Forming Machine For Building Materials Parameters
Purlin machine Punching system | With 3 cylinders punching holes. |
Interchange rollers | High quality bearing steel G Cr 15 with heat treatment |
Roller surface | Balck treatment or Hard chorme coating for options |
Machine body frame | 400 H type steel by welding |
Cutter type | No need change cutter for different size |
Cutter material | Cr12 with heat treatment |
Cutter frame | Welding by 30mm steel plate |
Hydraulic motor | 7.5kw |
Decoiler | Manual type x 1 set. |
Decoiler capacity | 5 tons |
Exit rack | 3 meters x 2 set |
Suitable material thickness | 1-3mm |
Shaft material | 45# high grade steel |
Shaft diameter | 80mm |
Machine main motor | 11 kw |
Roll forming speed | 10-18 meters /min |
PLC Control System | Omron |
Touch screen | Wuxi Xinjie |
Change size time | 5-10 minutes to change the size and cutter |
Control system | PLC, Inverter, TouchScreen, Encoder, etc |
The complete line includes decoiler, forming machine, computer controlling system and run out tables. Our machines are equipped with a computer controlling system to keep products accurate.
Packing Method
Main machine is packaged with plastic film
Transportation
All machines need one 40 feet container to hold
Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment.
Delivery Time
Within 35 days after receiving deposit.
Warranty
Two years, and we will provide technical support for wholelife of the equipment.
If some parts of machine broken within 2 year, we will give customer the spare parts for free. (include chain, bearing, roller,oil pipe, counting wheel) If more than 2 year, maybe some spare parts need to be charged. If machine can not work well, we can teach them online until the machine is perfect. If you need, we can go to your place to assist you. But you need to provide the cost of the engineer.
Contact Person: jack
Tel: +86 18932785588